Saturday 12 November 2011

New envelope and windows!

A lot of work has been going on at our house over the past few weeks.  The new windows are all in, and 3 of the 5 new doors.  We're still waiting for the front door and the small garage door.  The new Typar home wrap is almost complete.  Next will be the installation of the rainscreen and the wire mesh that the stucco will get applied to.  The stucco will have to wait until spring, since the weather is now too cold.  Here are some photos:


Instead of the pink fluff insulation around the window frames, they are using a spray foam insulation, which fills the space more evenly and therefore provides better insulation.  It's the white stuff between the wooden window frame and the drywall:

No comments:

Post a Comment